{"id":2941,"date":"2025-12-16T16:15:15","date_gmt":"2025-12-16T16:15:15","guid":{"rendered":"https:\/\/e-infra.ro\/?p=2941"},"modified":"2025-12-16T16:18:14","modified_gmt":"2025-12-16T16:18:14","slug":"nova-power-gas-a-inaugurat-la-floresti-cea-mai-mare-instalatie-de-stocare-in-baterii-si-a-inceput-lucrarile-la-centrala-pe-gaz-de-160-mw-in-ciclu-combinat-de-la-campia-turzii","status":"publish","type":"post","link":"https:\/\/e-infra.ro\/ro\/nova-power-gas-a-inaugurat-la-floresti-cea-mai-mare-instalatie-de-stocare-in-baterii-si-a-inceput-lucrarile-la-centrala-pe-gaz-de-160-mw-in-ciclu-combinat-de-la-campia-turzii\/","title":{"rendered":"Nova Power &amp; Gas a inaugurat la Flore\u0219ti cea mai mare instala\u021bie de stocare \u00een baterii \u0219i a \u00eenceput lucr\u0103rile la centrala pe gaz de 160 MW \u00een ciclu combinat de la C\u00e2mpia Turzii"},"content":{"rendered":"\n<p><strong>FLORE\u0218TI, 12 decembrie 2025 &#8211; <\/strong>Nova Power &amp; Gas, parte a grupului E-INFRA, anun\u021b\u0103 intrarea \u00een func\u021biune \u0219i \u00een exploatare comercial\u0103 a celei mai mari instala\u021bii de stocare a energiei \u00een baterii din Rom\u00e2nia, cu o putere de 200 MW \u0219i o capacitate de stocare de 400 MWh, localizat\u0103 la Flore\u0219ti, jude\u021bul Cluj.<\/p>\n\n\n\n<p>Tot ast\u0103zi, compania a anun\u021bat \u00eenceperea lucr\u0103rilor la centrala de produc\u021bie \u00een ciclu combinat de 160 MW din C\u00e2mpia Turzii, proiect care va intra \u00een operare la sf\u00e2r\u0219itul anului 2026.<\/p>\n\n\n\n<p>Valoarea celor dou\u0103 investi\u021bii dep\u0103\u0219e\u0219te 350 de milioane de euro.<\/p>\n\n\n\n<p>Prezent la evenimentul de inaugurare, ministrul Energiei, Bogdan Ivan, a declarat:<\/p>\n\n\n\n<p><em>\u201eStocarea energiei este infrastructura viitorului \u0219i reprezint\u0103, \u00een acest moment, una dintre solu\u021biile cele mai eficiente prin care putem reduce dezechilibrele din sistem, integra mai bine energia produs\u0103 de prosumatori \u0219i, cel mai important, \u021bine sub control costurile pentru rom\u00e2ni.<\/em><\/p>\n\n\n\n<p><em>Ministerul Energiei \u00eencurajeaz\u0103 orice investi\u021bie \u2013 public\u0103 sau privat\u0103 \u2013 care genereaz\u0103 valoare pentru consumatorul final.<\/em><\/p>\n\n\n\n<p><em>Ne dorim ca firmele rom\u00e2ne\u0219ti din energie s\u0103 devin\u0103 campioni regionali, iar Rom\u00e2nia s\u0103 fie un pilon de stabilitate \u00een regiune \u0219i un partener-cheie al Statelor Unite. Vom continua s\u0103 \u00eembun\u0103t\u0103\u021bim cadrul legislativ necesar pentru astfel de investi\u021bii, respect\u00e2nd rolurile \u0219i limitele institu\u021bionale ale statului. Vom continua s\u0103 fim un partener deschis pentru to\u021bi cei care construiesc valoare \u00een Rom\u00e2nia\u201d.<\/em><\/p>\n\n\n\n<p><em>\u201eProducerea de energie electric\u0103, stocarea \u0219i serviciile de echilibrare arat\u0103 strategia de investi\u021bii a companiei Nova Power &amp; Gas pentru urm\u0103torii ani. Compania are \u00een plan s\u0103 devin\u0103 unul dintre principalii juc\u0103tori \u00een domeniul produc\u021biei \u0219i furniz\u0103rii de energie electric\u0103 \u0219i gaz din Rom\u00e2nia, dar \u0219i extinderea accelerat\u0103 regional\u0103 \u00een urm\u0103torii ani\u201d, <\/em>a declarat Teofil Mure\u0219an, Fondator \u0219i Pre\u0219edinte al Grupului E-INFRA.<\/p>\n\n\n\n<p>Nova Power &amp; Gas este \u00een prezent lider na\u021bional \u00een capacit\u0103\u021bile de stocare \u00een baterii, cu 240 MWh opera\u021bionali. Compania \u00ee\u0219i continu\u0103 portofoliul investi\u021bional, care include dezvoltarea unei noi centrale pe gaz de 200 MW \u0219i peste 600 MW\/1200 MWh \u00een viitoare proiecte de stocare.<\/p>\n\n\n\n<p>Partenerul financiar tradi\u021bional al proiectelor dezvoltate de Nova Power &amp; Gas este Banca Transilvania.<\/p>\n\n\n\n<p><em>\u201cBanca Transilvania felicit\u0103 echipa Nova Power &amp; Gas pentru realizarea istoric\u0103, instalarea celei mai mari baterii de stocare a energiei din Rom\u00e2nia. Acest proiect, pe l\u00e2ng\u0103 faptul c\u0103 dubleaz\u0103 capacitatea de stocare a \u021b\u0103rii, contribuie esen\u021bial la asigurarea securit\u0103\u021bii energetice, integrarea surselor regenerabile \u0219i la tranzi\u021bia c\u0103tre un viitor sustenabil. Banca noastr\u0103 finan\u021beaz\u0103 deja o serie de proiecte, inclusiv capacit\u0103\u021bi de stocare dezvoltate de grupul E-INFRA \u0219i desigur c\u0103 avem un interes major pentru sus\u0163inerea acestui nou proiect\u201d, <\/em>a declarat Cosmin C\u0103lin, Director Executiv Senior Companii Mari, Finan\u021b\u0103ri Structurate \u0219i Factoring, Banca Transilvania.<\/p>\n\n\n\n<p>***<\/p>\n\n\n\n<p>NOVA POWER &amp; GAS, parte a Grupului E-INFRA, este o companie 100% rom\u00e2neasc\u0103, ce acoper\u0103 \u00eentregul lan\u021b energetic: produc\u021bie, furnizare, stocare \u0219i investi\u021bii majore \u00een infrastructur\u0103. Cu o produc\u021bie anual\u0103 de peste 550 GWh, dintre care peste 350 GWh regenerabile, Nova contribuie activ la tranzi\u021bia energetic\u0103 prin dezvoltarea de capacit\u0103\u021bi noi. \u00cen paralel, compania \u00ee\u0219i consolideaz\u0103 pozi\u021bia de lider \u00een stocarea energiei \u00een baterii. Nova furnizeaz\u0103 energie electric\u0103 \u0219i gaze naturale \u0219i dezvolt\u0103 proiecte esen\u021biale pentru echilibrarea SEN, coordonate prin propriul Dispecerat Energetic. Mai multe informa\u021bii sunt disponibile pe www.vreaulanova.ro.<\/p>\n\n\n\n<div class=\"is-layout-flex wp-container-3 wp-block-columns\">\n<div class=\"is-layout-flow wp-block-column\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"683\" src=\"https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/imagine-holografica_centrala-ccgt_campia-turzii-1024x683.webp\" alt=\"\" class=\"wp-image-2939\" srcset=\"https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/imagine-holografica_centrala-ccgt_campia-turzii-1024x683.webp 1024w, https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/imagine-holografica_centrala-ccgt_campia-turzii-300x200.webp 300w, https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/imagine-holografica_centrala-ccgt_campia-turzii-768x512.webp 768w, https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/imagine-holografica_centrala-ccgt_campia-turzii.webp 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"is-layout-flow wp-block-column\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"683\" src=\"https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/nova-power-gas_camera-de-comanda-1024x683.webp\" alt=\"\" class=\"wp-image-2936\" srcset=\"https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/nova-power-gas_camera-de-comanda-1024x683.webp 1024w, https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/nova-power-gas_camera-de-comanda-300x200.webp 300w, https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/nova-power-gas_camera-de-comanda-768x512.webp 768w, https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/nova-power-gas_camera-de-comanda.webp 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div class=\"is-layout-flex wp-container-6 wp-block-columns\">\n<div class=\"is-layout-flow wp-block-column\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"683\" src=\"https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/bess-floresti_-1024x683.webp\" alt=\"\" class=\"wp-image-2937\" srcset=\"https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/bess-floresti_-1024x683.webp 1024w, https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/bess-floresti_-300x200.webp 300w, https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/bess-floresti_-768x512.webp 768w, https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/bess-floresti_.webp 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"is-layout-flow wp-block-column\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"683\" src=\"https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/instalatie-stocare_floresti-1024x683.webp\" alt=\"\" class=\"wp-image-2940\" srcset=\"https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/instalatie-stocare_floresti-1024x683.webp 1024w, https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/instalatie-stocare_floresti-300x200.webp 300w, https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/instalatie-stocare_floresti-768x512.webp 768w, https:\/\/e-infra.ro\/wp-content\/uploads\/2025\/12\/instalatie-stocare_floresti.webp 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>FLORE\u0218TI, 12 decembrie 2025 &#8211; Nova Power &amp; Gas, parte a grupului E-INFRA, anun\u021b\u0103 intrarea \u00een func\u021biune \u0219i \u00een exploatare comercial\u0103 a celei mai mari instala\u021bii de stocare a energiei \u00een baterii din Rom\u00e2nia, cu o putere de 200 MW \u0219i o capacitate de stocare de 400 MWh, localizat\u0103 la Flore\u0219ti, jude\u021bul Cluj. Tot ast\u0103zi, [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":2938,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[35,9],"tags":[],"_links":{"self":[{"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/posts\/2941"}],"collection":[{"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/comments?post=2941"}],"version-history":[{"count":2,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/posts\/2941\/revisions"}],"predecessor-version":[{"id":2943,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/posts\/2941\/revisions\/2943"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/media\/2938"}],"wp:attachment":[{"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/media?parent=2941"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/categories?post=2941"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/tags?post=2941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}