{"id":2717,"date":"2025-07-22T10:53:00","date_gmt":"2025-07-22T10:53:00","guid":{"rendered":"https:\/\/e-infra.ro\/?p=2717"},"modified":"2025-07-22T12:27:46","modified_gmt":"2025-07-22T12:27:46","slug":"nova-power-gas-confirma-investitia-in-cea-mai-mare-instalatie-de-stocare-in-baterii-din-romania-si-isi-anunta-noile-investitii-doua-centrale-pe-gaz-de-150-mw-respectiv-200-mw-si-noi-instalatii","status":"publish","type":"post","link":"https:\/\/e-infra.ro\/ro\/nova-power-gas-confirma-investitia-in-cea-mai-mare-instalatie-de-stocare-in-baterii-din-romania-si-isi-anunta-noile-investitii-doua-centrale-pe-gaz-de-150-mw-respectiv-200-mw-si-noi-instalatii\/","title":{"rendered":"Nova Power &amp; Gas confirm\u0103 investi\u021bia \u00een cea mai mare instala\u021bie de stocare \u00een baterii din Rom\u00e2nia \u0219i \u00ee\u0219i anun\u021b\u0103 noile investi\u021bii: dou\u0103 centrale pe gaz de 150 MW, respectiv 200 MW \u0219i noi instala\u021bii de stocare de 1200 MWh"},"content":{"rendered":"\n<p><strong>Bucure\u0219ti, 22 Iulie 2025 &nbsp;&#8211; <\/strong>Nova Power &amp; Gas, companie rom\u00e2neasc\u0103 din sectorul energetic \u0219i parte a grupului E-INFRA, anun\u021b\u0103 <strong>demararea celui mai mare proiect de stocare a energiei electrice \u00een baterii din Rom\u00e2nia.<\/strong> Instala\u021bia ce va fi construit\u0103 \u00een localitatea Flore\u0219ti, jude\u021bul Cluj, va avea o capacitate de 200 MW \/ 400 MWh \u0219i va fi opera\u021bional\u0103 p\u00e2n\u0103 la finalul anului 2025.<\/p>\n\n\n\n<p>Odat\u0103 finalizat\u0103, aceast\u0103 investi\u021bie va dubla capacitatea total\u0103 actual\u0103 de stocare a energiei din Rom\u00e2nia, contribuind direct la stabilitatea re\u021belei na\u021bionale \u0219i la integrarea eficient\u0103 a surselor regenerabile.<\/p>\n\n\n\n<p><em>\u201ePe l\u00e2ng\u0103 acest proiect, Nova Power &amp; Gas \u00ee\u0219i continu\u0103 investi\u021biile \u00een infrastructura energetic\u0103 \u0219i anun\u021b\u0103 demararea unei centrale pe gaz de 150 MW la C\u00e2mpia Turzii, cu termen de punere \u00een func\u021biune pentru prima etap\u0103 \u00een decembrie 2026. Totodat\u0103, planurile noastre p\u00e2n\u0103 \u00een 2028 includ dezvoltarea unei noi centrale pe gaz de 200 MW \u0219i dezvoltarea de noi instala\u021bii de stocare de 600 MW \/ 1.200 MWh.<\/em><\/p>\n\n\n\n<p><em>Prin aceste investi\u021bii, ne propunem s\u0103 ne p\u0103str\u0103m \u0219i s\u0103 ne \u00eent\u0103rim pozi\u021bia de lider \u00een domeniul stoc\u0103rii \u0219i s\u0103 investim masiv \u00een producerea de energie electric\u0103 \u00een centrale pe gaz, pentru a sus\u021bine echilibrul \u0219i flexibilitatea sistemului energetic\u201d, <\/em>a declarat <strong>Septimiu Costea, CTO al Nova Power &amp; Gas.<\/strong><\/p>\n\n\n\n<p>Nova este la ora actual\u0103 <strong>lider na\u021bional \u00een capacit\u0103\u021bi de stocare a energiei,<\/strong> cu 240 MWh deja opera\u021bionali. Totodat\u0103, compania investe\u0219te masiv \u00een instala\u021bii de producere a energiei electrice, at\u00e2t \u00een centrale regenerabile, c\u00e2t \u0219i \u00een centrale&nbsp; pe gaz.<\/p>\n\n\n\n<p>\u00cen paralel, Nova este un furnizor important de energie electric\u0103 \u0219i gaze naturale, cu peste 4,6 TWh de energie \u0219i gaze livra\u021bi \u00een 2024 \u0219i o <strong>cifr\u0103 de afaceri de aproape 3 miliarde lei.<\/strong> Compania se afl\u0103 constant \u00een topul furnizorilor cu cele mai bune pre\u021buri, potrivit comparatorului ANRE.<\/p>\n\n\n\n<p>Compania este activ\u0103 \u0219i \u00een regiune, cu subsidiare \u00een Bulgaria, Serbia, Ungaria \u0219i Republica Moldova.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bucure\u0219ti, 22 Iulie 2025 &nbsp;&#8211; Nova Power &amp; Gas, companie rom\u00e2neasc\u0103 din sectorul energetic \u0219i parte a grupului E-INFRA, anun\u021b\u0103 demararea celui mai mare proiect de stocare a energiei electrice \u00een baterii din Rom\u00e2nia. Instala\u021bia ce va fi construit\u0103 \u00een localitatea Flore\u0219ti, jude\u021bul Cluj, va avea o capacitate de 200 MW \/ 400 MWh \u0219i [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":2724,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[9],"tags":[],"_links":{"self":[{"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/posts\/2717"}],"collection":[{"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/comments?post=2717"}],"version-history":[{"count":2,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/posts\/2717\/revisions"}],"predecessor-version":[{"id":2719,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/posts\/2717\/revisions\/2719"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/media\/2724"}],"wp:attachment":[{"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/media?parent=2717"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/categories?post=2717"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/e-infra.ro\/ro\/wp-json\/wp\/v2\/tags?post=2717"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}